Customer Success Story

A Bangalore-based IT MNC reduced its overall employee transportation costs by 30% 

Key Achievements:

  • 30% reduction in operations cost
  • Reduced fleet size from 100 vehicles to 80 vehicles
  • 30% reduction in trips/day (from 500 to 350)
  • Trip duration reduced by 25% ( from 60 mins to 45 mins)

 

The Challenge:

  • Manual trip sheet distribution process leading to work hours and errors
  • Poor occupancy of vehicles leading to many trips/day. Large number of trips with single occupancy of vehicle
  • Uneven jobs distribution among Drivers. Some Drivers get more than 10 trips/day and many drivers get only one trip/day
  • Manual routing leading to long trip distance and manual errors
  • High turnaround of attached vehicles

 

Solution Implemented:

Sun Telematics implemented web based solution with GPS Black box for 100 vehicles. Complete automation of processes for managing day-to-day transportation for 1000 employees.

 

Key Results:

  • Complete elimination of manual trip sheet, automated distribution of e-trip sheet
  • 30 % reduction in operations cost by reducing number of trips from 500/day to 350/day
  • Improved vehicle utilization (reduced single occupancy trips)
  • Trip duration is reduced from 60 minutes to 45 minutes
  • Number of vehicles reduced from 100 to 80
  • Automated routing and scheduling process leading to reduction in work hours

 

Download this Case Study in PDF

Get In Touch

No.1, 2nd Floor, 1st cross,
80 feet Road, 6th Block, Koramangala,
Bangalore-560 047, Karnataka, India.